Ario Caves Project 2016

2016: The Ario Caves Project expedition returned to the 600 m deep C4 to work on several promising leads in the main streamway at the bottom of the cave. Upstream, a 30m high waterfall was climbed to gain >300m of new passages while downstream, the sump was dived for a further 80m towards the nearby 2/7.

Read a summary of this year’s progress